Shell Building System

Home Wall Building System

WHAT IS SHELL BUILDING?

Shell building, as the term implies, involves constructing the exterior structure of a house, which includes the floor (slab), walls, and roof. This process typically accounts for 40-50% of the total construction time and costs for a project.

By focusing on the shell construction, Ecowall Builders improves efficiency and reduces both time and expenses for developers, builders and owner builders alike.

Yokine Panel House Build Before & After

This project was constructed in 2014 and is still standing strong and in perfect condition.

To give you an understanding of the time benefits of our Ecowall Builders building process, a 4 x 2 single storey home will take approximately 1 week to construct the walls.

Note that if you choose to have the electrical, plumbing, windows and doors pre installed into the panels then the time savings and cost savings are quite significant as opposed to brick, steel frame and wooden frame building methods.

BEFORE

wal

AFTER

STAGES OF SHELL BUILDING

The Eco Shell building system can be supplied as a complete service from Slab to lock up via four stages or we can supply and install the walls only.

STAGE 1
Slab / Suspended Floor

The first stage of the Ecowall Builders building system is the site preparation and laying of the concrete slab or installing the suspended floor. Ecowall Builders have alliance partners who specialise in the flooring and slab installation works.

STAGE 2
Wall Building (Internal & External)

Using the Ecowall panels we will install all external walls and internal walls.
NOTE: we can also supply and install external and internal finishes should you require this service.
Ecowall Builders have alliance partners who specialise in the external rendering, cladding supply, and installation works.

STAGE 3
Window & Door Installation

Following or during the installation of the External and internal walls this is where the windows and doors are to be installed. Ecowall Builders can supply and install the windows and doors as part of our service.

STAGE 4
Roofing Trusses and Roof Cover

The final stage of the Ecowall Builders building is roofing.
Ecowall Builders have alliance partners who specialise in the supply and installation works for the roofing solutions for your project.

wall cladding

WHAT ARE THE BENEFITS OF SHELL BUILDING BY ECOWALL BUILDERS?

  • Only one product and service provider to work with. By having only one supplier to install the floor, walls and roof, reduces the time and costs associated with these areas dramatically.
  • Saving money with secure pricing is guaranteed when building using the Ecowall Builders system. The Ecowall Builders range of products are not affected by increasing brick laying costs, and increasing steel and wood prices as the panel products are produced from sustainable materials.
  • Fly ash, mining wastes, coconut husk, hemp, and basalt as examples of the materials that are utilized which do not have any connection to the steel, wood and brick industries.
  • Extremely fast building is a very important benefit for building any project. By Ecowall Builders using a range of building products we are able to build at least 7 times faster that traditional building methods. Our range of products have been designed to be built easily and fast with a combination of unskilled labour under supervision or skilled labour. This means access to labour to build will not be delayed waiting for trades such as bricklayers, steel frame and wooden frame builders to have time to build your project.
  • Building sustainably is another very important reason to build with Ecowall Builders. Our panels are made from materials such as fly ash, mining wastes, coconut husk, hemp, and basalt.
  • Superior strength of the range of products due to the unique engineering technology design.
  • High fire ratings of up to 4 hours on the range of products.
  • Quiet acoustic ratings are a standard for all products.
  • Industry standard energy ratings can be easily achieved using the Ecowall Builders range of products, Future proof installation of plumbing and electrical works once the building has been complete. In years to come should you wish to add a power point or plumbing point you do not have to run external conduits or chase into the walls creating mess. Ecowall Builders products have been specifically designed with additional cores within the panels that allow any future plumbing or electrical installations quick and easy to do.

GALLERY

×